Skip to content
EcholocationBy Stark Fiber Enterprise

Engineering training by SFE · Prepared for PETRONAS

See inside the equipment.

Watch the isometric films. Jump to a chapter, then rotate, isolate and animate the same parts in 3D.

Equipment showcase

Mechanical learning

Centrifugal fuel transfer pump

Watch the volute open to reveal the impeller, shaft and mechanical seal.

Illustrative equipment studies

Choose a study

Open the academy ↗

Fictional training sample · TP-204

One pump. One drawing change.

Rev 3 changes “shaft seal” to “mechanical seal.” See which training records the revision affects and try a linked lesson.

Review the training impact

Run the live comparison to see which 3D labels, lessons and questions need review.

Finish as the instructor

Check the source, approve or reject each suggestion, and download the decision record. The quiz stays on hold while its approved answer key and distractors are missing.

Open the instructor dashboard ↗
Illustration of a pump casing, impeller, shaft and seal components
Illustrative component study

Explore the equipment

Inspect the seal in the 3D cutaway. Then try a short drawing-linked lesson and knowledge check.

Inspect the mechanical seal ↗
Try the lesson and knowledge check

The bearing cartridge supports the shaft on the drive side. Compare the drawing callout with the part in the model.

Which component supports the shaft on the drive side?

Watch the equipment films ↑

Pilot with SFE

Start with one piece of equipment.

Bring one approved drawing revision. Together we’ll test how quickly your instructor can update the 3D study, lesson and assessment.

Arrange a working session ↗

Pilot documents

One-page pilot proposal PDF ↗ 90-second walkthrough PDF ↗
Scope and success criteria
From SFE
A drawing-linked 3D study, lesson and assessment, plus the AI review and instructor export.
From PETRONAS
Approved, redacted drawings, matching training records and an instructor to validate the findings.
Proposed pilot measures
Compare reviewer minutes, affected records found and unsupported approvals against a manual review. Confirm the targets and proposed 10-working-day window at kickoff.