EcholocationRequest a quote
Echolocation

Engineering drawing revision review

When a drawing changes, give reviewers a clear list of the training records to check and the evidence behind each proposed update.

Concept illustration showing two pump drawing revisions and a changed seal detail
Concept illustration · Pump drawing revision

What your team gets

A drawing can be current while its model labels, slides or quiz answers still refer to the old design. Reviewers need a way to find each affected record and decide what can move forward.

  • A change register

    The relevant drawing changes, their source callouts and the affected lesson, model label or assessment item.

  • A review queue

    Suggested revisions, records requiring no change and items held for missing evidence.

  • A decision export

    A record of reviewer decisions and outstanding checks that the training team can carry into publication.

Try an example

Compare two drawings for a fictional pump and see how one seal change affects a model label, a lesson and an assessment question.

Open the sample revision review

Start with one case

What to send

Start with an approved before-and-after drawing pair, the revision note, the affected lesson or quiz, and the person who can review the changes.

What we agree before work starts

Agree which records are in scope and hold any proposed change where the source cannot support it. The appointed reviewer signs off.